Key Points for the Installation of Two Post Lift
2022-07-01
To ensure the safety and stability of lifting equipment installation, the following detailed operation specifications and precautions are provided, covering from foundation confirmation and work position planning to final debugging and operation: I. Foundat...
view detail 
Safety Operation Skills of Large scissor lifts
2022-06-24
1. Safety Inspection Before Lifting The safety inspection before using the lift can clearly understand the use status, maintenance, and maintenance needs of the equipment to ensure the normal operation of the equipment and that it is in a good working condi...
view detail 
Safety Operation Skills of Small Scissor Lifts
2022-05-26
During vehicle maintenance and repair processes, the scissor lift is used very frequently. Although the scissor lift is simple to operate, all safety inspections and precautions are indispensable; otherwise, safety accidents are likely to occur. The safe ope...
view detail 
Key Points for the Installation of Small Scissor Lifts
2022-05-09
I. Foundation Preparation Before Installation To avoid equipment tilting, abnormal noise, or even overturning due to insufficient foundation strength, before installing the lifting equipment, we should ensure that the newly poured concrete has been cured ...
view detail 
Safety Operation Skills of Two Post Lift
2022-05-04
In the process of vehicle maintenance and repair operations, the two-post lift is the most widely used and frequently used lifting equipment. However, if it is not operated in accordance with safety regulations during use, it is likely to cause personal and ...
view detail 
Key Points for the Installation of Large Scissor Lifts
2022-04-30
I. Foundation Preparation Before Installation To prevent equipment tilting, abnormal noise, or even overturning due to insufficient foundation strength, ensure that newly poured concrete has cured for over 20 days before installing lifting equipment. Differ...
view detail 
Key Points for the Installation of Four-Post Lifts
2022-04-05
To avoid equipment tilting, abnormal noise, or even overturning caused by insufficient foundation strength, ensure that newly poured concrete is cured for over 20 days before installing lifting equipment. Different types of lifts must meet the following cond...